Section 5310 in Ohio: How to Get an Accessible Vehicle Through ODOT, From Application to Delivery
ODOT's 5310 application window closed November 13, 2026. Here's what happens after the award, how to choose the vehicle, and how to be ready for fall 2027.
In this article ▾
Key takeaways
- ODOT’s SFY2028 Section 5310 application window closed November 13, 2026. Awards are expected in spring 2027.
- In Ohio, ODOT treats vehicles as capital projects: 80 percent federal, 20 percent local match.
- After the award you have 30 days to return the signed contract and your local share payment. Line up your match now.
- ODOT buys the vehicle for you through its term contracts. Size it by your riders: ambulatory seats plus wheelchair positions.
- Missed this round? Plan for ODOT’s letter of intent window in early September 2027. Without a letter, you can’t apply.
This guide is for Ohio nonprofits, DD providers, senior centers and county agencies buying wheelchair-accessible vehicles with Section 5310 money. It covers what happens after you apply, how to choose the right vehicle, and how to get ready if you missed this round.
BSI is a Columbus-area dealer on three of ODOT’s vehicle contracts, so we see what happens to a 5310 vehicle after the award. Find your situation below and jump to the part that matters most.
- ClosedSept 1–15, 2026Letter of intent window. Only agencies that filed could apply this round.
- ClosedNov 13, 2026ODOT’s application window (opened October 1) closed.
- NextSpring 2027Awards expected. Last cycle’s came in April and May 2026.
- ProjectedSept 2027Next letter of intent window, if ODOT repeats its schedule.
Program dates as of November 17, 2026, from ODOT’s 5310 pages. ODOT has not posted 2027 dates. Confirm with ODOT or your regional contact.
Where are you in the process?
I applied this fall
Awards are expected in spring 2027. Use the wait well.
- Know the 30-day clock. It starts when ODOT sends your contract and local share invoice.
- Decide which vehicle fits your riders and drivers.
- Talk to your insurer and your drivers early.
I missed this round
You have most of a year to be ready for the next window.
- Check your fleet’s age and miles against ODOT’s table.
- Build your 20 percent local match.
- Put the September letter of intent on your calendar.
What does 5310 pay for in Ohio?
Section 5310 is the federal program for transportation that serves seniors and people with disabilities. In Ohio, ODOT treats vehicles as capital projects. Eligible capital items include buses and vans, wheelchair lifts, ramps and securement devices (FTA Circular 9070.1H). For the full program definition, see FTA’s Section 5310 page.
80%
Federal share on 5310 vehicles in Ohio.
20%
Local match your agency pays.
30 days
To return the signed contract and local share payment.
ODOT buys the vehicle for you. ODOT buys vehicles for its 5310 subrecipients through its term contracts. After the award, ODOT prepares your contract and local share invoice.
Public agencies don’t need a separate bid. Outside of 5310, Ohio counties, cities, townships and other political subdivisions can buy from ODOT’s cooperative contracts without their own competitive bid (ORC 5513.01(B)).
As of September 21, 2026, from ODOT’s 5310 program pages and FTA Circular 9070.1H. This is general guidance. Confirm program rules with ODOT’s Office of Transit.
Who runs 5310 where you are?
Most of Ohio applies to ODOT’s Office of Transit. A few regions run their own process, and their dates differ. Eligible applicants are private nonprofits, plus public bodies that the state has approved to coordinate services or that certify no private nonprofit is available. Your project must come from your region’s locally developed coordinated plan.
| Who runs it | Area | Latest cycle |
|---|---|---|
| ODOT Office of Transit | Most of Ohio | SFY2028: letter of intent September 1 to 15, application October 1 to November 13, 2026. |
| MORPC | Columbus area | The 2026 application closed October 30. MORPC places the vehicle order itself for its grantees. |
| OKI | Cincinnati area | The last round closed January 9, 2026. No new dates posted yet. |
| NOACA | Cleveland area | NOACA expects its next round in 2027. No dates posted yet. |
| TARTA, SARTA, KYOVA | Toledo area, Stark County, Lawrence County | Contact each agency for its call for projects. |
As of September 21 and October 5, 2026, from ODOT’s 5310 page and each agency’s own page. OKI and NOACA dates are from past cycles.
I applied this fall. What happens next?
This is the part of 5310 most agencies have never done before. Here is the path from award notice to a vehicle in service.
- Award noticeODOT announces awards in spring. Last cycle that was April to May 2026.
- Contract and invoiceAn ODOT staff member prepares your contract and your local share invoice.
- The 30-day clockYou have 30 days to return the signed contract and your local share payment. Line up your 20 percent before the award arrives.
- Choose the vehicleODOT buys the vehicle through its term contracts. Each vehicle gets a Vehicle Cost Worksheet (VCW) that your agency and the vendor sign.
- Delivery and titleAsk for a current delivery estimate before you plan your first day in service. ODOT holds a lien on the vehicle, released at disposition.
- Keep reportingSemi-annual vehicle reports are due July 31 (for January to June) and January 31 (for July to December). ODOT does not send reminders. Missed reports start an escalation that can end with ODOT repossessing the vehicle and the agency losing future 5310 consideration.
As of September 21, 2026, from ODOT’s 5310 page, ODOT’s contract slides and its Reporting Requirements page. ODOT also requires a preventive maintenance plan with a vehicle application.
Book a VCW walkthrough
Bring us your riders and routes. We’ll go through your Vehicle Cost Worksheet with you and confirm it before it’s signed, so your vehicle fits the people who will ride it. Contact BSI or call 877-696-2287.
Which vehicles can you buy?
ODOT’s cooperative contracts are organized by vehicle type. Start with the people on board, then match the vehicle. Three questions get you most of the way there.
How many riders use wheelchairs?
Size the vehicle by your rider mix: ambulatory seats plus wheelchair positions. In ADA paratransit, 20 to 30 percent of trips are wheelchair trips (TCRP Synthesis 174). If your mix is similar, plan for more than one securement position.
Who drives?
A vehicle designed for 16 or more passengers, driver included, needs a CDL with a passenger endorsement (49 CFR 383.5). States can set their own thresholds. Count the driver when you count seats.
How do riders board?
Think about curbs, sidewalks and street space when you choose rear entry or side entry.

Accessible minivans
Door-to-door service with rear-entry or side-entry access and a comfortable, car-like ride.
Best for: small groups and one or two wheelchair riders.
ODOT contract 253-24, modified minivans, through June 30, 2028.

Accessible vans
Full-size vans with flexible seating for ambulatory and wheelchair riders, in gas, LPG and electric (Ford E-Transit) versions.
Best for: groups with both ambulatory and wheelchair riders.
ODOT contract 252-24, accessible vans, through August 31, 2027.

Light transit buses (LTN)
A 20-foot light transit bus on a Ford Transit chassis, with room for more riders and wheelchair positions.
Best for: larger groups and regular routes.
ODOT contract 248-27, light transit vehicles, LTN category only, July 1, 2026 to June 30, 2030.
Federally funded vehicles must stay in service for a minimum period before they can be disposed of. ODOT’s table lists 5 years and 120,000 miles for minivans, accessible vans and LTN vehicles (the table has more columns, so check ODOT’s page for your vehicle). Contract status as of September 21, 2026.
I missed this round. How do I get ready for fall 2027?
Most of a year is enough time if you start now. Five things to do between now and September:
- Check your fleet. Compare your vehicles’ age and miles to ODOT’s disposition table.
- Check your plan. Make sure your project appears in your region’s coordinated plan.
- Line up the 20 percent. Eligible match can include state or local funds, dedicated taxes, private donations, service-contract revenue, advertising income, and federal funds from non-DOT programs such as aging, medical or rehabilitation services. FTA funds can’t be used. (As of September 21, 2026.)
- Mark the calendar. ODOT’s letters of intent were due September 1 to 15, 2026. If ODOT repeats that schedule, plan for early September 2027. Agencies without a letter can’t apply, and ODOT also requires applicants to attend its Application Workshop.
- Track riders and trips. Log trips, wheelchair riders and daily miles now. It makes your next application and your vehicle choice stronger.
Get 5310 reminders
Leave your email and we’ll let you know when ODOT’s next window opens, when it closes and what to have ready.
What does a dealer do, and not do?
We help you size and spec the vehicle, match it to the right ODOT contract, and sign the vendor line of your VCW. We don’t write your application, promise an award or give legal advice. Here’s what you can count on at each stage.
- Before: help choosing. Tell us about your riders, routes and drivers. We’ll help match you to the right minivan, van or bus.
- During: help with your VCW. We walk you through your Vehicle Cost Worksheet and confirm it with you, so your vehicle fits your riders.
- Delivery: a smooth handoff. Our team walks you through your vehicle and its features, so your drivers feel confident from the first ride.
- After: service that stays. Fleet maintenance, body work and parts keep your vehicle on the road, from our Columbus-area locations.
- Always: reminders. Sign up above and we’ll tell you when future windows open and close.
Frequently asked questions
Can we still apply this round?
No. ODOT’s SFY2028 window closed November 13, 2026, and only agencies that filed a letter of intent between September 1 and 15 could apply. Plan for the next cycle.
How much will we pay?
ODOT treats vehicles as capital projects with a 20 percent local match. After the award, ODOT sends a local share invoice, and you have 30 days to return payment with the signed contract.
Can another grant cover our 20 percent?
Sometimes. Eligible match can include state or local funds, donations and federal funds from non-DOT programs such as aging or rehabilitation services. FTA funds can’t be used. Confirm your source with your regional contact.
Do our drivers need a CDL?
A vehicle designed to carry 16 or more passengers, including the driver, is a commercial motor vehicle that needs a CDL with a passenger endorsement (49 CFR 383.5, as of August 2026). States can set their own thresholds. Count the driver when you count seats.
Do we have to bid the vehicle ourselves?
No. For 5310, ODOT buys the vehicle for you. Ohio political subdivisions can also buy from ODOT cooperative contracts without their own competitive bid (ORC 5513.01(B)).
Can BSI write our application?
No. BSI doesn’t write grant applications or promise awards. We help you choose and spec the vehicle and walk through your VCW. For application questions, contact ODOT’s Office of Transit or your regional contact.
This page is general guidance, not legal or grant advice, and BSI does not write grant applications. Program rules, dates and funding shares can change. Confirm program rules with ODOT’s Office of Transit, your regional designated recipient or your 5310 program contact before you act.
Sources
- ODOT Transit Funding Application and Processes: SFY2028 letter of intent, workshop and application requirements.
- FTA Section 5310 Program: the federal program definition and circular.
- OKI Section 5310 Program: Cincinnati-area process, including vehicle cost estimate worksheets.
- NOACA Section 5310 Recommendations: Cleveland-area capital projects at an 80 percent federal share.
- MORPC Section 5310 Workshop Slides: an example of a regional application cycle and reporting requirements.
- Ohio Revised Code 5513.01: cooperative purchasing from ODOT contracts.
Not Sure What Fits the Rules?
Tell us your riders and routes. We'll recommend a compliant vehicle.